6-2-23
The third floor was fully sheetrocked in the Spring, and now it’s fully painted! Next, we’ll see cabinets going in all third-floor condos.
6-2-23
The third floor was fully sheetrocked in the Spring, and now it’s fully painted! Next, we’ll see cabinets going in all third-floor condos.