5-1-23
The second floor was fully sheetrocked in April, and the large Club Room and Lobby windows went in. This month the first floor will be sheetrocked!
5-1-23
The second floor was fully sheetrocked in April, and the large Club Room and Lobby windows went in. This month the first floor will be sheetrocked!